Seismic Evaluation of Shanghai Times Square Reconstruction ProjectThe building consists of 30 floors and 26 floors of the two towers, 6-story podium and 3-story basement composed of high-rise buildings, a total construction area of about 109000m2, the total building height of about 115.05m. As the owner intends to re-repair the building, for which the overall seismic performance of the building to be tested.

  Engineering Background:

  The building consists of 30 floors and 26 floors of the two towers, 6-story podium and 3-story basement composed of high-rise building, a total construction area of about 109000m2, the total building height of about 115.05m. As the owner intends to re-repair the building, for which the overall seismic performance of the building to be tested.

  solution:

  The multi-tower calculation model was established by analyzing the structure of the site, the material detection, the deformation detection and the load investigation. The seismic performance of the structure was analyzed and compared, and the seismic performance of the structure before and after the reconstruction was analyzed and compared. Suggestions to deal with the problem.

kM/QIW3Q1zCPZio4lOj6QOc9rSHUyzJKBNg+tFZ8zt4Geza/It1dcl8BN6YxaozgPxMyYFAE9Y8jLuOsbLjCLQFlBQTnpw8csICNpxH+vD0=