CASES

Home > Cases > Case presentation

Quality Inspection of Jiading Long Distance Passenger StationThe building is a reinforced concrete frame-tube structure house with 1 story underground and 22 floors above the ground. It started construction in 2009 and is subject to partial adjustment when the structure is capped but not yet completed. Therefore, the technical feasibility of local adjustment To make a comprehensive evaluation.

  Engineering Background:

  The building is a reinforced concrete frame-tube structure house with 1 story underground and 22 floors above the ground. It started construction in 2009 and is subject to partial adjustment when the structure is capped but not yet completed. Therefore, the technical feasibility of local adjustment To make a comprehensive evaluation.

  solution:

  On the basis of field engineering quality inspection, combined with the local adjustment scheme, the structural performance after the adjustment of the program is analyzed and evaluated, and the existing problems are put forward.

RVEVFyDY5rEtdyr3E8tjo+c9rSHUyzJKBNg+tFZ8zt4Geza/It1dcl8BN6YxaozgPxMyYFAE9Y8jLuOsbLjCLQFlBQTnpw8csICNpxH+vD0=